Robson Field House Interior renovation upgrades included new fire sprinkler system, HVAC, electrical upgrades with LED lighting, seating, paint, gym floor renovation as well as new scoreboard and videoboard. The challenge to this project was none of the gym area work could be accessed by a equipment lift, it was too high. A 35’ “dance floor” scaffolding system was erected to complete all work at the ceiling level in the gym before the floor could be renovated.